Mine was messed up. 4 or 5 pieces including a spiral fx. Plate and twelve screws. I was told to expect 4 months because of poor blood flow at the location of the fx. At three months, the spiral fx still hadn't started cortical bridging. After 11 months, I finally got the green light for riding SES. That was a fail. I sold back my ticket and cashed in my season pass via pass insurance. Still had fun at SES, though.